NOT KNOWN DETAILS ABOUT ATS SOCOMEC

Not known Details About ATS Socomec

Not known Details About ATS Socomec

Blog Article

รับประกอบตู้ไฟฟ้า – ตู้ควบคุมทุกชนิด

In automated moad they permit the checking of, and the onload changeover in between, two ability offer resource, in accordance Along with the parameters configured by way of two potentionmeters and four DIP switches.

To learn more on the advantages and functions of the C66 controller, refer to the relevant internet pages.

The ATyS g’s integrated controller is built to provide specific capabilities for these applications (genset startup, on-load or off-load tests…) together with the monitoring from the voltage and frequency of both resources for 3-phase and one-section networks.The generator provide need to be linked to swap II, Found at the rear.

Possibility to established periodic genset startup Risk to established periodic genset startup ATyS p switches supply extra functions for routine maintenance. They include things like a programmable genset starting off operate which permits the beginning dates and functioning periods to get configured.

5kW – DKPP1-4020AB 4P 20AAC21AC23A 415V: 20A: five.5kW 1NO+1NC DKPP1-4032AB 4P 32AAC21AC23A 415V: 32A: 11kW 1NO+1NC DKPP3-4040AB 4P 40AAC21AC23A…

ATyS p M are one-section or a few-section modular computerized transfer switches with optimistic split indicator. These are meant to be used in very low voltage energy offer techniques where by a short interruption of your load provide is acceptable during transfer.

ATyS t and g switches present sizeable time preserving all through commissioning (system can take 2 to 3 minutes). Owing to the design that allows commissioning via just two potentiometers (4 about the ATyS g) and 4 DIP switches, a scrrewdriver is all of that is needed to configure the parameters.

EN Source library has almost everything you would like to assist you to pick out the top electrical power solution.

Nice Grid, storage for integrating renewable Strength and islanding Paradise, a sensible network to the local people Solenbat optimises the Lively Power effectiveness of properties Stem, energy storage techniques for minimized electricity billing Innovation Close

Along with elevated electrical performances, ATyS p give a higher amount of safety ATS AISIKAI in the course of the complete set up lifecycle.

It will allow distant checking of obtainable ability resources as well as their parameters, timers, together with exhibiting the merchandise’s standing and configuration.

EN Useful resource library has everything you will need to assist you to select the most effective energy solution.

Speedy commissioning On First electricity up, the ATyS C55’s sensible wizard will guidebook the operator with the commissioning process.

Report this page